EDC Systems QLD completed electrical fault investigation and lighting replacement works within a maintenance pit at Transdev Queensland’s Capalaba Bus Depot.
The existing LED strip lighting was experiencing faults, including a failed driver and strip, while the remaining lighting provided very poor illumination throughout the pit.
Following the initial investigation, EDC recommended replacing all four existing LED strips rather than undertaking individual component repairs.
A new waterproof LED neon flex lighting system was selected to provide brighter, more consistent illumination and accommodate the practical requirements of the maintenance environment, including routine cleaning and washdowns.
The works included removing the existing LED strips, track and drivers, installing the replacement lighting and protective driver enclosures, and testing the completed installation.
Managed by EDC Project Manager Ed Cornell, the upgrade addressed the existing lighting faults and provided a replacement system better suited to the facility’s ongoing maintenance requirements.