Project

Laboratory Electrical & Communications Reinstatement

Electrical and communications recovery, reinstatement and laboratory fitout following fire damage within an operational laboratory environment.

Project Overview

EDC Systems QLD supported a long-standing client following a small fire that caused significant damage to electrical and communications infrastructure within a laboratory.

Working alongside emergency services, the EDC team identified and isolated electrical hazards to support safe access to the affected area. Following the incident, EDC remained on site to assist with the recovery works, including electrical isolation and make-safe activities, infrastructure removal, temporary power and lighting, site investigations and reporting.

Following the successful recovery phase, EDC Systems QLD was engaged to complete the new laboratory fitout. The works included power, lighting, emergency lighting, AV cabling, Cat 6 data cabling, fibre optic infrastructure and temperature monitoring cabling.

The project brought together multiple areas of EDC’s capability, from the initial response and remediation support through to the reinstatement and fitout of the laboratory’s electrical and communications infrastructure.

KEY WORKS

  • Electrical isolation and make-safe works
  • Remediation support, infrastructure removal and site investigations
  • Temporary power and lighting
  • Power, lighting and emergency lighting installation
  • Cat 6 data and AV cabling
  • Fibre optic and temperature monitoring infrastructure

Planning a Similar Project?

Speak with the EDC Systems QLD team about your data, communications and fibre optic infrastructure requirements.