EDC Systems QLD completed new pathway and landscape lighting works at an education facility to improve visibility and support safer access through the area after dark.
With a new playground planned for the same area, the EDC team identified that electrical cabling for the proposed lighting needed to be installed before the playground works progressed, as access to the required cable pathway would later be restricted.
Following client review of the proposed light fittings, EDC completed the installation of new pathway lighting and uplights to three trees. The completed works provided upgraded external lighting while ensuring the required electrical infrastructure was in place ahead of the planned playground works.